Hainan Haishen Tongzhou Pharmaceutical Co., Ltd
Release Time:
2021-06-24 17:48
The project requires a low humidity rotary dehumidifier unit with purification. Due to the small air volume required for HVAC design and the limited space reserved for the air conditioning room during civil engineering, the length of the purification type rotary dehumidifier unit exceeds that of the air conditioning unit. After receiving feedback from the customer, our company immediately dispatched technical personnel to the site for inspection. The final solution proposed by the customer was to make the unit into a U-shape and install it in the air conditioning room, without modifying the room or making significant changes to the existing air conditioning equipment. This truly achieved the effect of doing big things with small money. Received a five-star review from the customer.
Next
Next